Example of Shimizu Tunnel No 3 in UDEC 7.00

Software

Version Notes:
UDEC 7.00

Level: Intermediate
Runs in Demo: No

Write Up
Walk Through
Project Files
Consulting Services
Displacements in UDEC model

This example demonstrates the use of UDEC to model a tunnel excavation in jointed rock mass. In this demonstration, geometry sets are used to create the tunnel geometry. The Barton Bandis model is used to represent the joints. The "block solve relax" command is used to simulate the pre-relaxation of the rock mass while excavating the tunnel.

Keywords

  • Geometry sets
  • Barton-Bandis
  • Ground reaction curve
  • Shotcrete
  • Bolt
Latest News
  • WEBINAR: Solving Geothermal Challenges with XSite Numerical Modeling ITASCA Software and Baker Hughes are hosting a collaborative webinar to demonstrate how combining advanced...
    Read More
  • Twin Ports Interchange Project Named Winner of ACEC/MN Grand Award Innovative ground improvement strategy secures long-term stability for the region's busiest artery for commerce and...
    Read More
  • Summer Intern Spotlight ITASCA Minneapolis had another group of excellent summer interns this year across our consulting, software,...
    Read More

Upcoming Events
11 Aug
ITASCA Joins Caving 2026 as a Main Sponsor
We are pleased to announce that ITASCA will be participating as a Main Sponsor in Caving 2026, the leading international conference ded... Read More
15 Sep
ITASCA at EUROCK 2026: Advancing Innovation in Rock Engineering
ITASCA is pleased to announce its participation in EUROCK 2026 – ISRM Regional Symposium, taking place from 15–19 September 2026 in Sko... Read More
20 Sep
ITASCA to Participate in CouFrac 2026
ITASCA will be participating in CouFrac 2026, taking place from 20–23 September 2026 in Uppsala, Sweden. The conference brings together... Read More