Dewatering

Itasca can estimate the dewatering needs of a construction site or mine to temporarily lower groundwater levels below the natural groundwater level, in all seasons, to provide for safe excavation construction and working environment during operations. Itasca can predict dewatering rates, including numerical modeling to estimate dewatering and design and optimize the dewatering and water-disposal systems, drain holes, and monitoring wells.

Latest News
  • New ICG General Manager Itasca Consulting Group, Inc. is pleased to announce that Dr. Tryana Garza-Cruz is now our...
    Read More
  • COVID-19 Pandemic Response In this exceptional time of the COVID-19 pandemic, Itasca International and its offices worldwide are...
    Read More
  • ITASCA is pleased to announce the release of InSite v3.16 ITASCA is pleased to announce the release of InSite v3.16...
    Read More

Upcoming Events
6 Apr
2020 SME MN Conference
The 93rd Annual Meeting of the Minnesota Section of SME is THE top performing regional minerals conference in the Midwest. Featuring a ... Read More
6 Apr
PFC Introductory Training-Minneapolis - CANCELED
This four-day course provides guidance in the use of the PFC2D and PFC3D to simulate the mechanical behavior of granular and solid mate... Read More
20 Apr
3DEC and UDEC Introductory Training, CANCELED
An introduction to UDEC and 3DEC for application to geotechnical analysis.... Read More