Itasca provides third party reviews aimed at providing an independent and critical review of geomechanical, hydrogeological, and microseismic analyses performed by practitioners and other consultants. Reviews typically consist of three phases.

Phase 1: Initial Information Review and Site Visit

Itasca engineers review all existing and relevant technical documentation, which should include site plans, lithology of the surrounding soil and rock mass and some information on geomechanical properties (including stiffness and strength), soil and rock mass classification (including both natural fracturing and any blasting-induced fractures), and previous reports regarding stability analyses. Itasca engineers next visit the site and discuss any questions resulting from the information review. A brief site report is issued following the site visit, focused on a “green/red flag” high-level summary of the critical findings.

Phase 2: Geomechanical, Hydrogeological, and Microseismicity Review

Itasca will collect, organize, and review the existing site data, including previous assessments by client staff and consultants. As needed, this review includes interviews of operations staff, subcontractors, and consultants. Critical information considered includes dewatering and depressurization plans, observed and anticipated modes of ground failure as a function of season, and the factors of safety for the various modes and site sectors. Hydrogeology can be a key factor affecting ground stability. And because groundwater conditions in the slope may be affected by the regional groundwater flow condition, Itasca will, as necessary, review the regional geologic conditions based on the available data, such as precipitations, surface recharges, regional structures, and groundwater extraction.

Phase 3: Independent Assessment

Based on the review, Itasca may conduct an independent assessment of the hydrogeology and rock mechanics of the site. The rock mechanics assessment focuses on stability assessments based on the pore water pressures, soil and rock mass characteristics, and small- and large-scale discontinuities. Stability assessments will incorporate statics-based kinematics and deformation-based methods. The hydrogeological assessment will consider the future pore pressure distribution for the site. The phreatic surface will be constructed based on a combination of observed groundwater levels, analytical solutions, groundwater flow models, and Itasca’s experience.

Due Diligence Independent Review and Litigation Support

Itasca has extensive experience in providing independent due diligent review of mining projects for financial institutes and banks throughout the world. Itasca also provides expert support on litigation cases in mining, civil, and environmental projects.

Latest News
  • New ICG General Manager Itasca Consulting Group, Inc. is pleased to announce that Dr. Tryana Garza-Cruz is now our...
    Read More
  • COVID-19 Pandemic Response In this exceptional time of the COVID-19 pandemic, Itasca International and its offices worldwide are...
    Read More
  • ITASCA is pleased to announce the release of InSite v3.16 ITASCA is pleased to announce the release of InSite v3.16...
    Read More

Upcoming Events
6 Apr
2020 SME MN Conference
The 93rd Annual Meeting of the Minnesota Section of SME is THE top performing regional minerals conference in the Midwest. Featuring a ... Read More
6 Apr
PFC Introductory Training-Minneapolis - CANCELED
This four-day course provides guidance in the use of the PFC2D and PFC3D to simulate the mechanical behavior of granular and solid mate... Read More
20 Apr
3DEC and UDEC Introductory Training, CANCELED
An introduction to UDEC and 3DEC for application to geotechnical analysis.... Read More