Lined Tunnel Construction in Saturated Ground

Software

Version Notes:
FLAC 8.0

Level: Advanced
Runs in Demo: No

Write Up
Walk Through
Project Files
Consulting Services

A circular lined tunnel is constructed in saturated ground. The ground is dewatered during construction. The tunnel is supported by a temporary shotcrete liner, which is installed while the tunnel excavation is advanced. A final cast-in-place concrete liner is then constructed. The water level is then returned to the original level. The analysis determines the forces and moments that develop in the concrete liner when the water level is returned to the original level, and when the temporary shotcrete liner loses strength.

Keywords:

  • Circular
  • Tunnel
  • Saturated soil
  • Dewatering
  • shotcrete
  • concrete
  • liner

Materials:

  • Concrete
  • Soil
  • Water

Analyses:

  • Fluid Flow
  • Static
Latest News
  • 3DEC 9 Officially Released ITASCA announces the release of 3DEC v9, an advanced three-dimensional, hybrid discontinuum and continuum modeling...
    Read More
  • A Big Hand of Applause for Our 2023 Summer Interns ITASCA Minneapolis would like to extend our sincerest thanks to our 2023 summer interns for...
    Read More
  • Itasca has announced the release of FLAC2D v9 Itasca has announced the release of FLAC2D v9, revolutionizing the way we analyze and predict...
    Read More

Upcoming Events
25 Feb
SME MINEXCHANGE Conference & Expo
SME's annual conference and expo, MINEEXCHANGE, brings together mining and mineral industry professionals to share best practices and i... Read More
13 Mar
Getting Started with 3DEC
Objectives of the training: Understand the 3DEC numerical approach and the types of problems it can solveKnow how to manipulate the 3DE... Read More
8 Apr
3DEC In-Person Introductory Course
Live in-person introductory training course in Minneapolis, Minnesota. This course provides an overview of the capabilities and feature... Read More