Lined Tunnel Construction in Saturated Ground

Software

Version Notes:
FLAC 8.0

Level: Advanced
Runs in Demo: No

Write Up
Walk Through
Project Files
Consulting Services

A circular lined tunnel is constructed in saturated ground. The ground is dewatered during construction. The tunnel is supported by a temporary shotcrete liner, which is installed while the tunnel excavation is advanced. A final cast-in-place concrete liner is then constructed. The water level is then returned to the original level. The analysis determines the forces and moments that develop in the concrete liner when the water level is returned to the original level, and when the temporary shotcrete liner loses strength.

Keywords:

  • Circular
  • Tunnel
  • Saturated soil
  • Dewatering
  • shotcrete
  • concrete
  • liner

Materials:

  • Concrete
  • Soil
  • Water

Analyses:

  • Fluid Flow
  • Static
Latest News
  • Web licenses are now available! They are ideal for organizations with many users at different locations and/or for cloud computing....
    Read More
  • Itasca Symposium 2020 Proceedings Download the 2020 Itasca Symposium proceedings and presentations for free....
    Read More
  • Learn More About the Policies We're Updating We’re making updates to our End-User License Agreement, Website Terms of Use, and Privacy Policy....
    Read More

Upcoming Events
15 Jul
Concreep 11+ International Conference - CANCELED
Since 1956, the CONCREEP conference series has remained the key meeting for physicists, mechanicians, and engineers to present and deba... Read More
20 Jul
URTeC 2020
URTeC 2020 in Austin looks to push the boundaries and continue as the premier event focused on the latest science and technology applie... Read More
4 Aug
Deep Foundations Institute S3: Slopes, Slides and Stabilization
Technical Committees of Deep Foundations Institute (DFI) are combining their industry expertise to organize this 2.5-day conference on ... Read More