Hydroelectric Power Plants

In addition to hydroelectric dams, Itasca has worked on hydroelectric power plants including a pumped storage plant in Israel (Gavet) and hydropower stations in China (Baihetan, JinPing), India, and Colombia (Guavio and Sogamoso). Engineering analyses include site characterization, review of in-situ stress measurements, ground support evaluation and recommendation, excavation stability of large caverns during prefeasibility and construction, and underground facility layout design, including surge chamber geometry.

Latest News
  • Thank You to our Summer Interns ITASCA Minneapolis is lucky to have welcomed nine amazing and dedicated summer interns in our...
    Read More
  • Introducing IMAT: Transforming Mining Analysis Solutions Introducing IMAT: Revolutionizing mining analysis with advanced geotechnical modeling and seismic data integration....
    Read More
  • ITASCA Unveils XSite 4.0: Advancing Hydraulic Fracturing Simulation ITASCA announces the launch of XSite 4.0, a groundbreaking advancement in hydraulic fracturing simulation software....
    Read More

Upcoming Events
26 Aug
FLAC3D V9.1 and Griddle V2.0 2024
... Read More
17 Sep
MassMin
Held once every four years, MassMin unites global experts to tackle the industry's most pressing sustainability challenges. MassMin pro... Read More
22 Sep
SMRI Fall 2024
The Solution Mining Research Institute (SMRI) was established in 1965 as a venue for the solution mining and underground storage indust... Read More