News Article

Open Pit Dewatering: Dewater, Derisk, Deliver

Learn more about developing an effective strategy for open pit dewatering and avoiding common pitfalls in this article by Carly Leonida, European Editor of E&MJ, based on interviews with Itasca and SRK principal engineers. Read it here:

Web: https://www.e-mj.com/features/dewater-derisk-deliver

PDF: https://www.e-mj.com/wp-content/uploads/2020/08/EMJ-August-2020-flipbook-min.pdf#page=62

Itasca has hydrogeologists, geochemists, and geomechanical engineers in offices worldwide. Let us know if you have a dewatering or open pit stability concern or design need. Visit our website or contact a consultant for more information.

#itasca #hydrogeology #openpit #miningengineering #dewatering @eminingjournal

Latest News
  • Workshop: The “Big Five”: Numerical Modeling of Cave Mining This MassMin2020 workshop will review caveability, ground subsidence, infrastructure stability, fragmentation, and gravity flow associated...
    Read More
  • 2020 H. Bolton Seed Lecture: Open Issues about Soil Liquefaction Dr. Bruce L. Kutter delivered the 2020 H. Bolton Seed Lecture at Geo-Congress 2020 in...
    Read More
  • Webinar: Using Rigid Blocks in PFC This webinar will provide a brief overview of PFC modeling using convex rigid blocks, including...
    Read More

Upcoming Events
1 Dec
WEBINAR: What’s New in 3DEC Version 7
This webinar is for people who have used 3DEC before and are interested in the latest developments.... Read More
4 Dec
Analyses of Embankment Dams and Slopes Using FLAC
This hands-on, virtual training course is 16 hours total, spread over four days in a 1.5-week period, and covers the analysis of embank... Read More
8 Mar
FLAC3D Remote Introductory Training - Online!
Three days of general feature training addressing basic concepts and recommended procedures for geotechnical numerical analysis.... Read More